>Usually when I really put effort in something I’ll do it so very detailed it’s scary – covering every little thing. And this terrace-build was a huge project and I was thinking of every thing that could go wrong, covering every angle. I even had extra bits for my screwdrivers! And it was particularly important that weekend because saturday was a national holiday in Sweden so couldn’t easily get new stuff.
But there was one not so minor detail I miscalculated – when I rented the drill I rented a drill that drilled 20 cm wide and 80 cm deep holes. The slabs I was putting in was 18 cm wide and 70 cm deep. Should’ve worked right?… wrong! The slabs where 18 cm but square, not round, so the holes needed to be 23 cm! And it only drilled 55-60 cm so not nearly deep enough! So we spent the better part of Saturday on our knees digging out the 27 holes wide and deep enough. But once that was done, the frame and beams went up like a beauty! At 9 pm on Sunday evening I waved off my workforce and this morning I put in 4 beams for the floor and it looks good!
Check out the gallery.
And thank you dad for doing so much of the work! Thank you AC for doing so much of the digging! Thank you mother for taking care of Sam, too bad he had a bad day on Saturday! Thank you Ricki for your help! And thank you Helena for keeping up morale and serving drinks and buying hotdogs and making sure everyone was happy!
I have very good family & friends!!
You must be logged in to post a comment.